The forepeak and vberth area after scraping and painting. This tedious job is a must in order to see th econdition of all frames and planks from the inside. After launching, this will show where any relative motion takes place between structural members. It also will show where water may be intruding. (paint the overhead too!) I may replace the 3rd floor from the bow. When they installed a pvc watertank, they punched an oversize hole for the water lines. Not good!