Home Photo Gallery E-mail Us
 The Cheoy Lee WILLIE B III  

The foreward half of the stbd side with oakum driven in and seam compound on the seams below the waterline.  Above the waterline the seams are filled with Life-Caulk which seals but can also be sanded and varnished.

The foreward half of the stbd side with oakum driven in and seam compound on the seams below the waterline. Above the waterline the seams are filled with Life-Caulk which seals but can also be sanded and varnished.


Powered by Gallery v1 RSS