Home Photo Gallery E-mail Us
 The Cheoy Lee WILLIE B III  

After the rough sanding and cleaning the seams, oakum is driven in with a caulking iron. This serves 2 purposes: first it helps seal the seam, and also it is driven in with a hammer and it forces the planks tightly together.  This way the entire hull becomes on structural unit and is therefore stronger.

After the rough sanding and cleaning the seams, oakum is driven in with a caulking iron. This serves 2 purposes: first it helps seal the seam, and also it is driven in with a hammer and it forces the planks tightly together. This way the entire hull becomes on structural unit and is therefore stronger.


Powered by Gallery v1 RSS