Home Photo Gallery E-mail Us
 The Cheoy Lee WILLIE B III  

This is how far I had to go to remove all rot.  The hatch was held in by 14 bronze screws and bedding compound.  Both sides of the roof plywood were cut off back to good wood. A new piece of ply will now be installed and a layer of glass will replace the bad section.

This is how far I had to go to remove all rot. The hatch was held in by 14 bronze screws and bedding compound. Both sides of the roof plywood were cut off back to good wood. A new piece of ply will now be installed and a layer of glass will replace the bad section.


Powered by Gallery v1 RSS